Skip to content

Staging only: main with the HR bundle on the GOBL staging branches (do not merge) - #79

Draft
XiaoY-X wants to merge 2 commits into
mainfrom
eu3-hr-staging
Draft

XiaoY-X wants to merge 2 commits into
mainfrom
eu3-hr-staging

Conversation

@XiaoY-X

@XiaoY-X XiaoY-X commented Nov 19, 2026

Copy link
Copy Markdown

Part of EU3-18

Staging only. Do not merge, do not review as a change. This branch exists so that a staging build of silo can run the Croatian eRačun flow before the release chain lands.

What it is

main (bc7ee62, v0.512.0) plus two commits:

  1. 88a8751, the bundle change under review in Bundle the hr-eracun-v1 addon and the HR CIUS UBL format from gobl.hr.eracun #78: blank imports of gobl.hr.eracun/addon and gobl.hr.eracun/ubl, the editor example and the README row.
  2. fa92675, go.mod and go.sum only, pinning the integration branches:
Module Pseudo-version Branch
gobl v0.512.1-0.20261118235559-364312914fee invopop/gobl#1045 (main + invopop/gobl#724 + invopop/gobl#1044)
gobl.ubl v0.101.1-0.20261119000013-6cc8ab847ff4 invopop/gobl.ubl#196 (main + invopop/gobl.ubl#179 with invopop/gobl.ubl#183)
gobl.hr.eracun v0.0.0-20261119000157-7916abcdbb32 invopop/gobl.hr.eracun#7 (invopop/gobl.hr.eracun#1 on the two above)

Every other module stays at the version main has. Pseudo-version of this head: v0.512.1-0.20261119000448-fa92675a897b.

Who pins it

silo's eu3-hr-staging branch. Please don't delete, rebase or force-push this branch while it is pinned.

Checks on the head

  • go test -race ./...: pass (Go 1.26.2).
  • golangci-lint run ./...: 0 issues.
  • gobl convert editor/examples/hr-eracun.json --to ubl+hr-eracun-v1, then phorm 2.2.11 hr.gov.porezna.eracun:ubl-invoice:1.0.4: no errors (warnings UBL-CR-006, UBL-CR-200, UBL-CR-597). The file imports back as ubl+hr-eracun-v1.

How it goes away

When #78 can merge on released modules (its TODO list), gobl.dev is released from main, silo pins that release, and this pull request is closed without merging.

🤖 Generated with Claude Code

XiaoY-X and others added 2 commits November 19, 2026 00:04
….eracun

Blank imports of gobl.hr.eracun/addon and gobl.hr.eracun/ubl, which
registers ubl+hr-eracun-v1, with a Croatian eRačun example for the editor.

gobl.hr.eracun is pinned to the head of its first pull request until the
module is tagged. It needs the hr regime and gobl.ubl fields that are not
released yet, so this does not build against GOBL v0.512.0.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
…ommits

Staging only: do not merge.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
@codecov-commenter

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 65.72%. Comparing base (bc7ee62) to head (fa92675).

Additional details and impacted files
@@           Coverage Diff           @@
##             main      #79   +/-   ##
=======================================
  Coverage   65.72%   65.72%           
=======================================
  Files          53       53           
  Lines        2719     2719           
=======================================
  Hits         1787     1787           
  Misses        822      822           
  Partials      110      110           

☔ View full report in Codecov by Harness.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.
  • 📦 JS Bundle Analysis: Save yourself from yourself by tracking and limiting bundle sizes in JS merges.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants